Part 1, was replacing the water pump
Part 2 was repairing rust and refinishing as required.
Part 2 is about 75% complete - wet and cold weather holding things up.
After completing Part 1, I did a few test drives to confirm no leaks. But what I did notice, was that the braking was very rough. So while waiting for better painting weather, I...
Part 3 of 98 E320 repairs
Part 2 was repairing rust and refinishing as required.
Part 2 is about 75% complete - wet and cold weather holding things up.
After completing Part 1, I did a few test drives to confirm no leaks. But what I did notice, was that the braking was very rough. So while waiting for better painting weather, I...
Part 3 of 98 E320 repairs
---------------------------------------------------------------------------
Visit this link to stop these emails: https://zapier.com/manage/zaps/84252715/stop/?check=635700447bac1ba5e129dce101685c9d